Três Irmãos Substation
- 440/138kV transformer and 440kV bars.
- Parallel system, RDP set and 2 HMI/Gateway panels.
Henry Borden and Carbocloro Substations
- LT 230kV Henry Borden – Carbocloro (PP and PA) and RDP set
Itapetininga II Substation
- Two 138/88kV transformers and coupling/TIE.
- AC/DC parallelism and auxiliary service system
Capão Bonito Substation
- 230kV capacitor bank.
- Conventional and RDP control panel.
Supply of a complete SPCS solution - Protection, control and supervision system intended for the Nerópolis substation belonging to Enel Distribuição Goiás - (formerly Celg - D), through a contract formed by the consortium Enel Soluções and Progen SA with direct billing to end customer The Kraft Heinz Company.
Supply of a turn key solution for the automation of the Mineiros substation including all relevant equipment and services, such as the supply of Mechanical Projects, Protection & Control Panels, AC/DC Auxiliary Services Panels, HMI SAGE Panel, IED Parameterization, TAF, TAC, Commissioning, Integration into SAGE and Training. The supply is a partnership between STD and the PROGEN ENERGY Consortium formed by the engineering companies PROGEN SA (SP) and ENERGY SYSTEM Serviços ESPECIALIZAÇÕES (GO).
Salto Substation
Salto Substation
- 440/138kV transformer (PP and PA).
Execution of installation services for the automation, protection and remote control system for digitalization and modernization of the Porto Alegre 1, Viamão 1, Pelotas 2, and Rio Grande substations belonging to the CEEE-D system.
Xavantes Substation
- 138/13.8kV transformer, coupling/TIE and 6 13.8kV feeders.
- Capacitor bank, AC/DC auxiliary service and RDP set
Firminópolis, Rio Vermelho and Serra Caldas Substations
- 5 138kV lines, 2 transformers, 2 couplings/TIE, 6 feeders and RDP set.
Limestone Substation
- 2 lines (PA and PP), transformer and 230kV bars.
- AC/DC auxiliary service, measurement and billing panel, RDP and RARP set.
Três Irmãos Substation
- 4 138kV lines, RDP and RARP set.
Supply of Lot 03 of the SINOCON Project (National Operability and Controllability System), through the implementation, replacement and expansion of Remote Terminal Units - UTR in systemic installations of the National Interconnected System - SIN, aiming to overcome existing supervision and control liabilities , adequacy to the supervision and control requirements established in the ONS Network Procedures. The supply served ISA agents CTEEP, CESP, DUKE ENERGY, EMAE and AES TIETE.
Supply of 64 Remote Terminal Units for supervision and control of several CTEEP substations belonging to the Basic Network and Supervision in compliance with the requirements of the ONS Network Procedures.
Supply of Remote Terminal Units for real-time monitoring of a set of information from the facilities of Camaçari II, Boa Esperança, Penedo, Campina Grande, Boa Esperança II, Cícero Dantas, Paulo Afonso III, Teresina and Milagres, as defined in the Submodule 2.7 (telesupervision requirements) of the ONS Network Procedures.
29 UTRs
112 equipment
135 pieces of equipment
83 UTRs
62 UTRs
190 pieces of equipment
130 pieces of equipment
Supply of 11 UTR'S - Remote Terminal Units manufactured by STD for the CPTM Line 10 Field Signaling System comprising the stations of São Caetano, Mauá, Mooca, Ipiranga, Vemag, Utinga, Santo André, Capuava, Ribeirão Pires and Rio Big.
Automation of 98 Substations (voltage levels from 230 to 440KV) and implementation of ONS Submodule 2.7 in Basic Network substations
Automation of 96 Substations (128 UACs and 07 Micro Remotes).
Automation of 89 Substations (UTRs and Protection Panels).
Turquoise Line Automation.
SE Bandeirantes (in progress)
SE Campos (in progress)
162 pole RTUs for Distribution Automation and Protection Panels.
Automation of 43 Substations.
Automation of 10 Plants and implementation of ONS Submodule 2.7.
04 UTRs.
Três Irmãos Substation
Automation of HPP Ilha Solteira and HPP Jupiá.
02 COS, Automation of 09 Substations and 51 Sites (Telecommunications Supervision).
01 COS, Automation of 30 Substations and 56 Distribution RTUs.
Automation of 12 Substations.
Automation of 06 Substations.
01 COS, Automation of 32 Substations and supply of 66 Remote Controlled Switches.
Estamos presentes no mercado de energia elétrica e oferecemos soluções de supervisão, controle, proteção e automação para Usinas de Geração, Subestações de Transmissão/Distribuição e sistemas de Energia para Ferrovias.
As a manufacturer of supervision and control equipment, we have our own versatile technology, implementing customized solutions through the development and improvement of our products. We have a successful track record in supplying and commissioning SPCS panels.